FRIENDS OF RECREATIONAL AND SPORTING WATERS OF SHEDIAC BAY INC., NON-PROFIT
SHEDIAC BAY 10- TON JIB CRANE PROJECT
- INFORMATION AND OUESTIONS&ANSWERS. MEETING
- WHEN: MARCH 13, 7 :00 PM TO 8: 15 PM. . 30 MINUTE PRESENTATION FOLOWED BY QUESTION AND ANSWER PERIOD.
- WHERE: MONCTON LIONS SENIOR CITIZENS CLUB-AUDITORIUM, 373 ST. GEORGES BLVD., MONCTON
- WHO: PRESENTATION BY JAMIE STOREY, ANY QUESTIONS CALL JAMIE AT
532-6572
- INVITATION: TO ALL BOATERS
- 10 - ton Jib Crane HILITES February 9, 2007
- LOCATION- approximately 30 feet south of the existing wharf ramp and on the east side of the roadway to the S.B.Y.C. Marina Wharf on Pleasant Street in Shediac
- Loading and Unloading- Boats on trailers will be backed up to this location. A spreader barf strap system will be utilized to pick up boats off the trailer. Crane will rotate 180 degrees and lower boat into the marina basin.
- Mast Hoist System- A separate mast! hoist system will be provided for installing and removing mast(s). It will consist of a vertical post, horizontal bar, electric winch, wire rope and pulley system
- Management of Crane- A non-profit company made up of its chartered members will be responsible to finance, insure, operate, manage and maintain the jib crane throughout its working life.
- Based on the success of campaign to raise up-front equity and bank loan in place by March 31 of this year, crane can be ready for use by mid-June.
|